1979
There have been a number of different foot bridges across the stream at Living Waters, however, after it was washed out in a drywash overflow in 1979, it was decided that a permanent bridge with concrete footings on either side of the stream was necessary to keep camps running smoothly.
This was also the year that construction on the Nature Center began, being completed the following spring. The Nature Center's impact, though not yet felt, would be undeniable, especially in the area of Living Waters becoming a Creation-oriented Bible Camp.